01Street occupancy planning
New Westminster uses a Street Occupancy Permit process for use of public street space. Describe whether the activity changes vehicle, pedestrian or bicycle movement, and distinguish the work zone from storage, parking or loading space requested for the project.
02Traffic plans and access
The City’s guidance calls for a traffic management plan when street use affects movement, with exceptions described for some uses such as bins or moving trucks. Confirm the requirements for the actual activity. Do not assume a small footprint or short duration eliminates the need to consider public access.
03Identify affected entrances
Provide a layout showing the property frontage, building entrances, loading points and pedestrian routes alongside the work. Explain how deliveries or equipment will arrive and depart. These details help the project team discuss closure limits and any personnel needed to coordinate traffic movements.
04Separate phases and occupancy
Tell us when setup starts, when the work occurs and when the occupied area is removed. If materials remain between shifts, identify that separately from the crew’s working hours. Share the occupancy approval and current plan so the service booking reflects the permitted arrangement.
05Arrange the right services
NORTHSTAR offers BCCSA-certified traffic control personnel, lane closure technicians and trucks, and TMP and permit support. Explain your activity and existing plan so we can discuss the personnel, equipment and supervision required. Confirm the scope and applicable approvals before work starts.
06Request a New Westminster quote
Request a quote with the full address, work description, requested dates, daily hours and site contact. Mention any existing plans or permit conditions. Call (604) 217-2915 for 24/7 dispatch and current availability. A quote enquiry does not reserve a crew or guarantee permit approval.