01Select the activity type
Maple Ridge’s Highway Use Permit guide distinguishes development and transportation activities, including separate requirements for oversize or overload movements. Describe the actual work or movement when contacting us so the planning discussion starts with the appropriate permit category.
02Match documents to the job
The City lists different supporting documents for different Highway Use Permit types. A site occupation, utility activity and vehicle movement may not use the same package. Share the relevant checklist, any submitted site plan and review comments rather than assuming one plan covers every part of the project.
03Confirm the work window
Maple Ridge identifies different work-hour considerations for general activities, arterials and closures, and school zones. Check the current guide and the conditions issued for your job. Tell us about nearby school access and the proposed shift so crew scheduling follows the approved work window.
04Define the route or footprint
For a fixed work site, provide the occupied area and access points. If your activity involves vehicle movements, include the proposed route and start and end points. Note whether traffic control is needed at one location or at several positions along the activity.
05Arrange the right services
NORTHSTAR offers BCCSA-certified traffic control personnel, lane closure technicians and trucks, and TMP and permit support. Explain your activity and existing plan so we can discuss the personnel, equipment and supervision required. Confirm the scope and applicable approvals before work starts.
06Request a Maple Ridge quote
Request a quote with the full address, work description, requested dates, daily hours and site contact. Mention any existing plans or permit conditions. Call (604) 217-2915 for 24/7 dispatch and current availability. A quote enquiry does not reserve a crew or guarantee permit approval.